Axis 7100 Installation Guide Page 90

  • Download
  • Add to my manuals
  • Print
  • Page
    / 424
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 89
Powering Up/Down Procedures
Advanced Dicing Technologies Ltd.
3.1-2
Restore dialog window that appears on the monitor screen after an
abnormal shut down:
Checking the "Allow Database Restoration" checkbox enables the options of
database restoration from backup.
Figure 3-1: Database Restore dialog window
Note: After Power On, and before normal operation, it is recommended to
warm up the system by running a simulated dicing session for thirty minutes.
The User should place a Workpiece on the Cutting Chuck, define and assign a
Recipe, and run simulated dicing for thirty minutes. The User must ensure that
the Cut Depth is set so that the Blade does not enter the Workpiece and no
Kerf Check or Cut Verification algorithm is selected. The spindle should rotate
at typical speed (the speed used for dicing) with cutting water on.
This simulated dicing, in the system steady state, warms up the Model 7100 to
prepare it for normal operation. Advanced Dicing Technologies Ltd. suggest
creating a warm-up recipe.
Page view 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 423 424

Comments to this Manuals

No comments